Our Process
A clean filter, a clean pool
We disassemble, deep clean, and verify every component to restore maximum filtration performance.
01
System Shutdown
We safely turn off all equipment and release system pressure before opening the filter tank.
02
Disassembly & Inspection
We remove filter cartridges or grids and inspect them closely for tears, cracks, or wear.
03
Deep Washing
High-pressure spray washing combined with a degreasing or descaling chemical soak for maximum cleanliness.
04
O-Ring Lubrication
We clean and apply Teflon-based lubricant to the O-rings to prevent air leaks and extend their life.
05
Reassembly & Verification
We reassemble and restart the system, verifying improved water pressure and flow rate.
Filter running slow?
We'll have it cleaned and running at full performance — usually same week.